367,935 sq ft (34,182 sq m) Grade A logistics facility.
18m clear height and floor loading capacity of 60kN/m2 with jointless concrete floor slabs.
38m - 85m service yard depths including secured site with fencing, access gatehouse and vehicle barriers.
Located within Sheffield on the A631, just 0.5 miles from the M1 J34 and Sheffield Rail Station less than 2 miles away.
With sustainability and wellbeing features at its core.
BREEAM ‘Excellent’ Shell and Core accreditation and EPC ‘A’ ratings.
Predominantly industrial surroundings with occupiers including ClipperLogistics; Great Bear; Pretty Little Thing; Royal Mail; Marks and Spencer and Ikea.
CORE Sheffield occupies one of the city's most prominent locations for a logistics asset. This urban logistics location is highly accessible via road, rail, tram & bus.
| UNIT A | sq m | sq ft |
| Warehouse | 31,865 | 342,991 |
| Offices | 1,794 | 19,314 |
| Transport Office | 497 | 5,345 |
| Gatehouse | 26 | 285 |
| Total | 34,182 | 367,935 |
Clear internal height
Floor loading
Dock levellers
Three-storey offices
Level access doors
Yard depths
Car parking spaces
HGV spaces with EV charging facilities
Cycle parking spaces
Power available
CORE Sheffield is strategically located just 0.5 miles from the M1 J34, providing fast access to the national motorway network including Leeds to the north, Nottingham to the south and the ports of Immingham and Liverpool.
CORE Parks are designed to minimise the impact on the environment and contribute to building sustainable communities in locations we invest.
We strive to be recognised as much for our commitment to responsible business as for the quality of our commercial real estate developments and services.
We have engaged in a holistic sustainability strategy at the front end of development, rather than reactively responding to new regulatory demands. This provides a substantial benefit to occupants of our buildings and facilitates stronger, more sustainable communities.

Our strategic partnership with Altus Power will enable clean electrification as a ready-to-go solution for customers at CORE Sheffield.
Additional PV installation, through our funding partner, can provide up to 2MWp of renewable energy to offset operational carbon at reduced cost to standard network supplies.
100% PV ready roof structure; with base build PV installation
Design and material selections underpinned by Carbon Footprint analysis
95% re-use or recycling of site-won materials
Sustainable discharging of rainwater to the canal. Water conservation appliances
Cycle, scooter, motorbike shelters and shower/changing facilities
Multi-modal EV charging (5% active; 5% passive)
Enhanced building thermal envelope performance
15% rooflights and facade windows to warehouse loading areas
Fully controlled, ultra-efficient LED lighting internally and externally
Waste segregation and recycling facilities
Energy and fuel monitoring and management systems
Gains in site-wide biodiversity and ecology
Landscaped amenity and wellbeing areas
Direct access to adjacent canal and tram amenities
The workforce of Sheffield is well-suited to a distribution environment with 77% of the working population currently employed in the service sector. This is 1% higher than across England as a whole, with 21.2% of the 77% working in retail and distribution.
Sources: nomisweb.co.uk, ons.gov.uk
For more information please submit an enquiry, or contact the joint agents:
Mike Baugh
mike.baugh@cbre.com +44 (0)7785 284994Danielle Raunjak
danielle.raunjak@cbre.com +44 (0)7714 145984